Functieomschrijving
- Reports directly to the site manager.
- Approve the job safety analysis and the method of statement related to the civil and structural activities.
- In charge of supervising all the piling, civil, undergrounds, roads & paving and building erection works in accordance with site Inspection & test plan.
- Follows works on site (about 70% of his time on site). She/He shall continuously support and control its disciplines Subcontractor and give technical/progress advices.
- Ensures the compliance of the works performed with the project drawings.
- Ensures the compliance of the works performed with the Air Liquide E&C quality standards (E&C Global standard).
- Knows and uses project drawings and Air Liquide specifications in order to perform the Scope of Work
- Shall anticipate the works coming (based on the approved S/C schedule and with the construction manager) studying the project drawings in advance, clarifying with the project engineer the potential questions, verifying that the S/C will be ready to perform its works (critical material available, specialized companies or resources mobilized, Methods of statements issued and approved...)
- Shall ensure that Air Liquide free issue items required for its own Scope of Work are delivered in time and make coordination with the Material manager
- Shall ensure that AS BUILT drawings are properly issued and updated by the S/C on a weekly basis
- Shall report at least 2 safety hazardous situation or non conformities per week by filling the Safety Notes and submitting it to the HSE manager
- Shall stop the works when safety or quality issues are found until corrective action is implemented
- Performs all the inspections on site as per ITP (with the support of site QA/QC team when required)
- Updates the own set of project documents (drawings…) with the last revisions issued (paper copies)
- is the leader of the S/C weekly meeting and issues the Minutes of Meeting (coordination with QA/QC, HSE, Scheduler, Material, and Contracts teams)
- Every Minutes of Meeting will be prepared in detail BEFORE every weekly meeting (at least 12h before) and reviewed with the site manager (if any)
- Follows up the detail schedule with S/C, reports any deviation on weekly basis to the site manager and establishes action plan with S/C to recover the delay
- Opens NCR related to the Scope of Work, propose solution and follows them until they are closed informing the QA/QC manager
- Performs weekly reviews on the compilation of the quality files (by the S/C) and informs QA/QC manager in case of major deviation found
- Reviews, comments and supports the QA/QC manager in order to approve the ITP
- Updates and signs the ITP with the inspection performed
- Validates on a weekly basis the progress on the Scope of Work through feedbacks to the site manager
- Supports the site manager in order to track the installed quantity on all the Scope of Work
- Track the quantities in order to ensure the remeasurement of the scope of work
- Shall lead tool box with the subcontractor 2 at 3 times by weeks on specific safety or technical points with the support of HSE manager for safety tool box and technical tool box with the site manager
Functie eisen
- From a background of civil engineering, you ideally benefit from successful experience of at least 10 years as a Civil work supervisor with as well experience as steel structure supervisor.
- An experience of design will be beneficial as well.